This involved construction of a new walkway structure between two office blocks.
The walkway and supports were formed from steelwork and used angled columns. Design was undertaken using structural software to ensure stability. The angles of the columns were also a challenge as there were large moments to be dealt with on the structure and the foundations. Consideration to bridge bearing points was also critical and had to be considered.